Transformer stations – Ústí nad Labem
One side of the transformer station building in Ústí nad Labem collapsed due to waterlogging and separated from the rest of the building. In order to prevent further settlement, we drilled holes through the foundation strips with core drilling, into which we applied rammed micropiles. The cracks were then secured with glued-in helical stainless steel bars.
- CATEGORY 2020 , Core drilling , STATIbar , STATIpile
- TAGS