Church of St. Nicholas – Turnov
The building of the Church of St. Nicholas in Turnov have developed cracks on the outer and inner walls. All the cra... -
Transformer stations – Ústí nad Labem
One side of the transformer station building in Ústí nad Labem collapsed due to waterlogging and separated from the ... -
Hotel u Sixtů – Phase II
During the second phase of the reconstruction of the buildings of the future hotel u Sixtů on the Old Town Square in... -
Hotel u Sixtů in Prague
During the reconstruction of the buildings of the future hotel at Sixtus on Old Town Square in Prague, it was necess... -
Church – Bzí
The Church of the Holy Trinity in the village of Bzí is undergoing gradual repair and restoration. The repairs also ... -
Creating a new opening – panel house Prague
The investor’s wish was to make a new opening in the load-bearing wall of a panel house in Prague. In order no... -
Automotive – increasing the load capacity of the floor structure
In the warehouses and production halls of the automotive industry, we have increased the load-bearing capacity of th... -
Fara – Dlažkovice
During the static securing of the former rectory building in Dlažkovice, it was necessary to make an additional post... -
Garden pavilion foundation – micropiles – Kamenice
A garden pavilion will be added to the family house in Kamenice. For the foundation of the steel-wood grid of the fu... -
The cottage Zbyny
The cottage in the village of Zbyny developed cracks indicating wall separation and other deformations. The separati... -
Church Brandýs nad Labem
The wall around the church in the town of Brandýs nad Labem – Stará Boleslav was considerably cracked with wid... -
Continental Jičín
Application of a micropiles in the Continental production hall in Jičín. Capture of additional load on foundations. ... -
The Evangelical Church in Cheb
The Evangelical Church in Cheb underwent reconstruction, during which cracks in the walls and cages were tightened w... -
The Negrelli Viaduct
The Negrelli Viaduct (also called the Karlín Viaduct, formerly generally the viaduct of the State Railway Company) c... -
Repair of cracks in apartment house – Mladá Boleslav
Cracks were detected in an apartment building in Mladá Boleslav, which were secured using stainless steel helical re... -
Gymit fitness center securing masonry cracks
The vaults in the future Gymit fitness centre in Ústí nad Labem were cracked and some were sagging. It was necessary... -
Church Liběšice helical reinforcement
Cracks appeared in the tower of the Church of St. Martin and the Visitation of the Virgin Mary in Liběšice, which we... -
Tesco Liberec – carbon slats
There were penetrations in the ceiling structure of the Tesco building in Liberec and it was necessary to secure the... -
Hospital in Ústí nad Labem
Part of Building A of the Masaryk Hospital in Ústí nad Labem underwent reconstruction, during which carbon slats wer... -
Roudnice nad Labem micropiles
During the reconstruction of the house in Roudnice nad Labem, aluminium micropiles ø100mm were applied to secure the... -
Preschool – Kadaň
The corner of the school building in Kadaň was subject to uneven settlement and needed to be secured with micropiles... -
The Negrelli Viaduct
In the next phase of the reconstruction of the Negrelli Viaduct, the lower faces of the damaged arches were secured.... -
Villa Hermann Schubert
In order to strengthen the foundations of the winter garden at the Villa Hermann Schubert in Hrádek nad Nisou, it wa... -
Falak-ol-Aflak Citadel
Falak-ol-Aflak Citadel is located in the city of Khorramabad, Iran. The walls of this fortress have been breached by... -
Carbon Fiber Lamella – Chodov
The investor’s wish was to reinforce the ceiling structure of an apartment building in Chodov. A swimming pool... -
Farmhouse – Čeradice
During the reconstruction of the farmhouse in Čeradice, it was necessary to statically secure part of the building. ... -
Imperial Spa Carlsbad
One of the points of the overall reconstruction of the building of the Imperial Spa in Karlovy Vary was the securing... -
Family house – Brozany nad Ohří
Part of the apartment building in Brozany nad Ohří was subject to uneven subsidence. As a result, cracks appeared on... -
Becher’s Villa – Karlovy Vary
Our company was approached to carry out static securing of cracks on the Becher Villa in Karlovy Vary and securing o... -
Winternitz Mills – Pardubice
In the Winternitz Mills building in Pardubice, new openings were to be made in the reinforced concrete walls. In ord... -
Family house – Chabařovice
Numerous cracks have appeared on a family house in Chabařovice due to uneven settlement of the foundation joints. Fu... -
Golf tees Poděbrady – micropiles
A new indoor teeing ground was to be built on the golf course in Poděbrady. The foundations of this construction wer... -
Karlova Koruna Chateau – stables
During the next stage of the revitalization of the Karlova Koruna Chateau in Chlumec nad Cidlinou, it was necessary ... -
Rectory of Dlažkovice
There were numerous cracks in the load-bearing walls and ceilings of the parish building in Dlažkovice. In addition,... -
Turnov brewery
Numerous cracks appeared on the building of the Town Brewery in Turnov. We managed to secure them with stainless ste... -
Apartment building – Ústí nad labem, Klíše
Cracks have appeared on the apartment building in Ústí nad Labem – Klíše due to uneven settlement of the build... -
Family house – Encovany
The extension of a family house in Polepy – Encovany started to separate from the rest of the house due to une... -
Family house – Dobrovice
A family house in Dobrovice had problems with uneven foundation settlement. The foundation strips were secured with ... -
Family house – Přišimasy
The reconstruction of the family house in the village of Přišimasy – Skřivany also included the construction o... -
Satran Mill
A part of the Satran Mill in the village of Vepřek was in a poor condition from a structural point of view. There we... -
Josef Popel’s Steam Mill – Chabarovice
The building of the former mill in Chabařovice was in bad condition after a long period of dilapidation. Cracks had ... -
Kindergarten Nezvěstice
Cracks have appeared on the building of the kindergarten in Nezvěstice. We managed to secure them with local rods ma... -
Kadov Fortress
During the reconstruction of the Kadov Fortress, the cracks on a part of the building were secured with the help of ... -
Castle Náchod
The foundation joint on the buttress of the castle in Náchod has shifted. In order to prevent further shifts, holes ... -
Vyšehrad Czech Republic
Execution of static securing of the crack of the Old Burgrave’s Office above the Vltava. Climbing applied heli... -
Karlstejn Castle Czech Republic
Core borehole for conducting electrical installations inside walls 17m long.... -
Riga Domus – Latvia
Saving the gable masonry of the dome in Riga from restoration work. Insight into History of Riga Cathedral. Wikipedi...